POWER PLANT

Heating facility at MAN Trucks in Poland

Heating system at the truck assembly plant if MAN Trucks in Niepolomice, Poland. (2022)

The heating plant has a maximum capacity of 13.8 MWth. It consists of two pellet boilers and one gas boiler. The system provides heating for office and social buildings, production halls, necessary heating for own production processes, the coating and drying process of the trucks as well as maintenance halls.

 

Project details

HEATING CAPACITY between 1MW and 13.8MWth, flexibly adjustable to the weather conditions and production

OPERATING HOURS 24 hours, 7 days a week, 365 per year

 

Back to projects Back to projects
Heating facility at MAN Trucks in Poland

Interested in working with us?

Or visit our office at

Bamendaweg 38
3319 GS Dordrecht, The Netherlands